Storm Damage Repairs

Storm Damage Repairs

GeoStabilization was engaged as a specialist ground improvement sub-contractor to design and remeditate five slip sites on SH1 Dome Valley. The soil nails were installed using both rope access hand drilling and our purpose-built SuperNailer machine. The original contract was for three sites, with an additional two sites added during the contract following a high degree of client satisfaction for the first three sites. Extensive pull-out testing was undertaken on the soil nails as well as UCS testing on grout samples.